Climate Control Polyhouse

We provide and construct these types of systems according to client requirements. As the air moves across the house to the fans, the air picks up heat from solar radiation, plants, and soil, and the temperature of the air gradually increases.

Working Process

  • 1.Fabrication
  • 2.Design & Work
  • 3.Wholesale Material Supply

Specifications of climate control equipments for CCPH models:

1. Exhaust Fans Minimum 50″ size & having about 20000 to 25000 cfm

For effective cooling inside the green house Exhaust Fans having heavy galvanised steel box frame each having capacity of minimum 20000 CFM at 0 static pressur. The number of Fans shall be calculated as per the requirement so as to maintain the temperature inside the green house as follows-

below 35 CWhen ambient temperature is 42 C & ambient humidity is between 30 – 40 %
below 37 CWhen ambient temperature is 40 C & ambient humidity is between 60 – 70 %
Fans shall have SS blades with aerodynamic design so as to give maximum efficiency with minimum power consumption, and are belt driven axcial flow fan, having centrally auto openable louvers & GI sheet & Grills.
 

2. Cellulose Cooling Pads

4″ or 6″ thick impregnated cellulose cooling pads of suitable area, calculated so as to maintain the temperature inside the green house as follows-

below 35 CWhen ambient temperature is 42 C & ambient humidity is between 30 – 40 %
below 37 CWhen ambient temperature is 40 C & ambient humidity is between 60 – 70 %
The Pads shall be stifff enough to make it self supporting even at continuous water flow and at the same time is efficiently protected against any decomposition caused by water and air, resulting in minimum working life span of 3 years.
 

3. Water circulating system for Pads

Water circulating system shall comprise of all Aluminium Frame, Gutter & Cover, PVC Pipe for water distribution on cooling pad so as to wet the pad completely.

4. Fogging system

Fogging system, including 16mm lateral pipes at a spacing of maximum 3 mtrs., 4 way Foggers with anti leak device, at spacing of maximum 3 mtrs., HDPE Submain, Ball valves, Fittings & accessories. Foggers shall be capable of producing water droplets of less than 90 microns. (PVC submain shall be allowed if it is burried below the soil surface)

5. Control Head for Water circulating system

Control head consisting of –
1) Water storage tank having capacity to hold minimum water
required for continuous operation of fogging system for 1 hour
2) ISI marked Pump having sufficient capacity so as to keep the pads always wet.
3) Disc Filters having capacity required for above system
4) By-pass assembly, Valves, fitting & accessories

6. Control Head for Fogging system

Control head consisting of-
1) Water storage tank having capacity to hold minimum water
required for continuous operation of fogging system for 1 hour,
2) ISI marked Pump having sufficient discharge so as to operate all the foggers at any given time, at minimum pressure of 35mtrs. at the point of emitter.
3) Sand Filter & Disc Filters having capacity required for above system
4) By-pass assembly, valves, pressure gauge, fitting & accessories.
5)Powder coated Panel box including digital timer, MCB,contactors, relays, auto starter, auto manual switch, Voltmeter, wiring, etc.

7. Controller

For maintaining the proper & adequate temperature & humidity simultaneously inside the Polyhouse a microprocessed based programmable, Temperaure, Humidity & Time based Conroller, user Friendly, with 1 Humidity Probe & 2 temperaure Probes shall be installed. The Controller shall controll Pad Pump, Fogger Pump & Fans individually for controlling climate. The controller shall be provided with suitable constant voltage transformer for the safe working of the controller.
 

8. Control Panel Box

All electricals shall be enclosed inside a control panel duly powder coated and consisting of a set of MCB, relays, contactors, manual/Auto Mode including wiring. Separate MCB for each Fan, Pump for Pad & Pump for Foggers shall be provided.

9. Wiring

All electricals shall be connected by using ISI marked copper wire cable of required size. These wires shall be enclosed in ISI marked conduit pipe. The entire electrical work shall be certified by licenced electrical engineer.

Frequently Asked Questions

Have a look at the landscaping services section for a more detailed understanding, but essentially after your free consultation we respond to your brief with a suggested process tailored to your requirements, whether that's the complete design and management service, or only aspects of it.
Have a look at the landscaping services section for a more detailed understanding, but essentially after your free consultation we respond to your brief with a suggested process tailored to your requirements, whether that's the complete design and management service, or only aspects of it.
Have a look at the landscaping services section for a more detailed understanding, but essentially after your free consultation we respond to your brief with a suggested process tailored to your requirements, whether that's the complete design and management service, or only aspects of it.
Have a look at the landscaping services section for a more detailed understanding, but essentially after your free consultation we respond to your brief with a suggested process tailored to your requirements, whether that's the complete design and management service, or only aspects of it.